Our projects
BUILT FOR
the grid.
Every Auren asset begins with a specific system need. The portfolio is shaped around renewable surplus, network constraints and the moments when flexible capacity matters most.
Operating + construction2.4 GWh
Development pipeline4.8 GWh
Priority markets6
THREE PLACES.
THREE DIFFERENT
grid needs.
Auren does not repeat one project everywhere. Each asset is shaped by its local electricity system, renewable resource and development context.
DevelopmentNairobi
Kenya · Solar shifting + fast-growing evening demand.
Capacity60 MW / 240 MWh
RoleUrban peak + resilience
StageDevelopment
ConstructionMarrakesh
Morocco · Utility-scale solar capture + evening dispatch.
Capacity150 MW / 600 MWh
RoleSolar capture + evening dispatch
StageConstruction
OperationalEdinburgh
Scotland · Wind integration + network flexibility.
Capacity200 MW / 400 MWh
RoleWind congestion + ancillary services
StageOperational
THE NEXT
NODE.
NODE.
Bring us a constraint.
A site, renewable project or grid problem can become the next Auren asset.
InputSite / grid need
ScreeningAtlas
NextOrigination
